Sub Process
Creation
The sub-process is use to automated every task for Process on the Process Builder window. Many sub-process could it be added to structure the Process has a standard directory . For each Sub-process the sequence will automated with the software by image , the Smart Icons. The Smart Icons will be configure and interconnect between them to meet the desire sequence and intelligent to play.
Task List
Final Result
Return
Process Builder
The Process Buider is accessible by the Process Directory . The Process have check dot red or green attach on it. Right Click on the desire Process and select “Edit Process” .
Open Process Builder
Process on edition mode
Created a new Sub-Process
1-
Right Click on Process and select “Edit Directory Branch” or Double Click.
The process has alway a red or green dot attach on it.
2-
Right Click on the Process and select “Insert-> Sub Process”
In the text Box enter the Sub Process name and Click Accept
3-
Click Save
Sub Process is saving
Process on edition mode
Delete Sub-Process
1-
Right Click on on the Process and select “Edit Directory Branch” or Double Click.
The process has alway a red or green dot attach on it.
2-
Right Click on the sub-process that you want to delete and click delete
3-
Click Save
Sub Process is deleted
Process on edition mode
Move Sub-Process
1-
Right Click on on the Process and select “Edit Directory Branch” or Double Click.
The process has alway a red or green dot attach on it.
2-
One left click on the sub-process that you want to move.Use the side arrow to move the sub-process position.
3-
Click Save
Sub Process position is Save
Process on edition mode
Rename Sub-Process
1-
Right Click on on the Process and select “Edit Directory Branch” or Double Click.
The process has alway a red or green dot attach on it.
2-
3-
Click Save
Double Click on on the sub-Process.
In the text Box enter the new Sub Process name and Click Accept
Sub Process new name is Save
Created a Sub-Process automated procedure
1-
2-
3-
Smart Icons windows Edition
The Smart Icons window will turn orange (Edition mode)
Double Click on the Sub-Process
Right click into the Smart Icons window to adding the desire smart icon. Many smart icons could be add into the editon smart icon window.
The Smart Icon will appear
Use the connector to do the connection between all the Smart Icons
Left Double click on the smart icons to edit. Set the parameters on it.
5-
Right click on Smart Icon Start and select: Play. All processes will be executed from Start to Finish. Before do the play ,make sure than the Start and the Finish smart icons are connected.
4-
The attribute window of the smart icon will appear
6-
Click Save
Sub Process automated procedure is created
Delete Smart Icon
Right click on Smart Icon Start and select remove
The smart icon and his connectors are deleted
Delete Connector
Right click directly on Smart Icon Start and select disconnect
All connectors deleted
Both side
One side
Right click directly on connector and select disconnect
Top connector deleted
Zoom to Fit
Right click window editor and select zoom to fit.
The branch is on the left side screen
The Start smart icon will be center on smart icon window editor
Hold the Left click to do the connection between two smart icons
Input Connector
Output Connector
The green status indicates that the Sub-Process working correctly
The zoom to fit is use to center all the smart icon branch.The start smart icon Start is used to center all branch.
Smart Icon Start
Smart Icon Finish
Smart Icon Start
Smart Icon Finish
Play Mode
The play mode could be start from any smart icons. Right click on the desire one and select play. Before do the play ,make sure than the Start and the Finish smart icons are connected.
Video
Video
Video